1. The bridge will NOT be totally closed.
2. The repairs will start on November 1st, 2023.
3. The repairs will last for 3 months.
4. The bridge will be closed for 4 hours on weekdays.
5. On weekdays, the bridge will be closed by midnight and will be opened by 04:00 a.m.
6. The bridge will be closed throughout the weekend (Saturday and Sunday).
7. On weekdays, road users will have access to the bridge from 04:00 a.m. till midnight (No need to panic).
8. The maintenance is needed as the bridge is old.
9. Replacement of railings, installation of solar-powered lights, and installation of CCTV cameras are all part of road maintenance plans.
Summary:
10. Monday - Friday: Road closed from 12 midnight till 4:00 a.m.
11. Saturday - Sunday: Total closure.
0 Comments